Pre-sprint brief that locks scope, the decision the sprint must unlock, team and role assignments, logistics, inputs to bring, and success criteria before Day 1 of a Foundation Sprint. Use after the readiness verdict is Go and before the sprint begins. Produces a one-page artifact the team and Decider sign off on as the contract for the next two days.

  • 632 次安装
  • 770 星标
  • 收录于

安装命令

npx skills add https://github.com/product-on-purpose/pm-skills --skill tool-foundation-sprint-brief

SKILL.md

Foundation Sprint Brief

Produce the one-page brief that aligns the team on scope, decision target, participants, logistics, and success criteria before Day 1 begins. A well-built brief prevents Day 1 from opening with re-litigation of why-are-we-here; a missing or vague brief almost guarantees it.

Family contract: docs/reference/skill-families/foundation-sprint-skills-contract.md. This skill is a member of foundation-sprint-skills.

When to Use

  • The readiness verdict from tool-foundation-sprint-readiness is Go (or Conditional Go with preconditions cleared).
  • The sprint has dates blocked on calendars and you need the artifact that names what the sprint is for.
  • The team has prep activities scheduled and you need a written reference for what to bring.
  • A skeptical exec wants to know "what is the team doing for two days?" and you need an answer that fits on one page.